General Description: Complete project of refunctionalization of the Ship “Carmen de Avellaneda” for its use as a floating dock to moor and unload Handy Max and Handy Size type ships in order to receive various solid fertilizers.
Work: Executive Project:
- Concrete stirrups for Supporting Bridges.
- Concrete Civil Works Dolfines Amarre.
- Metallic Work Access / Egress Bridges for Trucks
- Metallic struts in boat hull for fixing fenders.
- Metal Hopper for Fertilizer reception.
- Mooring cleats and safety elements.
- Movement of floors down for trucks to the operating dock area
Location: Timbúes – Province of Santa Fe.
Date: January 2008. February 2009.
Work: Preliminary Project, Quotation Specifications – Executive Project Specifications, Contractors Coordination and Civil Works Management:
- Calculation memories for Wet Work.
- Metalwork calculation memories.
- Formwork Plans.
- Armor Blueprints.
- Iron Cutting and Bending Sheets.
- Assembly Drawings Metallic Elements.
- Geometry and Metallic Structure Dimensioning.