General Description: Complete project of refunctionalization of the Ship “Carmen de Avellaneda” for its use as a floating dock to moor and unload Handy Max and Handy Size type ships in order to receive various solid fertilizers.

Work: Executive Project:

  • Concrete stirrups for Supporting Bridges.
  • Concrete Civil Works Dolfines Amarre.
  • Metallic Work Access / Egress Bridges for Trucks
  • Metallic struts in boat hull for fixing fenders.
  • Metal Hopper for Fertilizer reception.
  • Mooring cleats and safety elements.
  • Movement of floors down for trucks to the operating dock area

Location: Timbúes – Province of Santa Fe.

Date: January 2008. February 2009.

Work: Preliminary Project, Quotation Specifications – Executive Project Specifications, Contractors Coordination and Civil Works Management:

  • Calculation memories for Wet Work.
  • Metalwork calculation memories.
  • Formwork Plans.
  • Armor Blueprints.
  • Iron Cutting and Bending Sheets.
  • Assembly Drawings Metallic Elements.
  • Geometry and Metallic Structure Dimensioning.